Russell Library Flooring Project Information

Study Spaces

  • During the week of October 8th:

    • Computers on the 2nd floor of the library will be limited so that new flooring can be installed. Students needing computer access are encouraged to use Lab 122 on Thursday, October 9th, and Lab 119 on Friday, October 10th. 

    • The 2nd and 3rd floors of the library will be closed beginning Saturday, October 11th – Tuesday, October 14th. Card swipe access to the first floor will be available during this time. Normal operations will resume on Wednesday, October 15, at 7:30 a.m.

Classroom Spaces

  • The flooring contractors are aware of the need to access Classroom 241 and The Learning Center. Once they are working in these areas, there will be a pathway available for use.

LIbrary Collections

  • Books and materials remain accessible 

  • Some items will be temporarily relocated from bottom to top shelves 

  • Need assistance reaching materials? Ask a Librarian: text 478-845-3057 or call at 478-445-4047